Rental Turnover Photo Documentation Checklist
Keep move-out condition and make-ready work distinct. Number turnover items by room and track open or blocked vendor work in a line-numbered CSV.
At move-out, the kitchen sink cabinet has a water stain. Three days later, the plumber replaces the supply line and the cabinet still needs a dry-out check. Keep the dated move-out photo with the unit inspection. In the make-ready report, use KIT-01 to record the plumbing work, and give the follow-up check a separate line. The property manager can see what the vendor did and what the unit still needs.
Download the free Sample PDF + CSV ZIP without logging in from the rental turnover photo report template. To use your own unit and scope, start a job photo report.
Take a move-out baseline before the make-ready crew starts
- At move-out, record the property, unit, date and inspector. Walk the unit room by room. Take a wide frame to orient the viewer and a close-up for each condition that needs review. Keep dated originals with the move-out inspection.
- At make-ready intake, assign work-order lines to the items being addressed. Link each line back to the matching move-out photo where available. If conditions changed after move-out, take a fresh before photo and note the source and date.
- After the vendor visit, photograph the same fixture or surface from a comparable angle. Note the visit date, work performed and any check still due. Keep a progress photo with an Open or Blocked status if there is more work to do.
Keep the move-out inspection and make-ready packet under separate filenames. The inspection records the unit's condition on one date. The packet records the scope, result and follow-up for the turnover work.
Walk the unit in the same order each time
Put the property, unit address, work order, inspection or visit dates, and invoice reference on the report. Use a room prefix and a sequence for each independently assigned or verifiable task. These example items belong to work order TURN-3B-018.
ENT-01· Entry · Repair the loose strike plate and check the latch.KIT-01· Kitchen · Replace the leaking sink supply line. Plumber records the leak check.KIT-02· Kitchen · Recheck moisture at the sink cabinet base after dry-out.BTH-01· Hall bath · Replace the cracked vanity top. Photograph the installed top and check the fixture.
List items in walking order and keep their IDs stable. When the painter finds another patch after the walkthrough, give it a new room ID or the next unused number for that room. Use the same IDs in vendor instructions, the PDF and the CSV.
Turn the CSV into a vendor follow-up list
Export the PDF and CSV together. Use the exported Line, Room, Scope, Status and Notes to filter for unfinished work. In the tracking copy, add columns for vendor or owner, blocker, next action, and next check date. You can also put those details in the work-order notes so the report carries them. Keep dates and actions specific enough for someone else to take over.
These two sample rows show different reasons a line can remain on the list.
Line,Room,Status,Vendor or owner,Blocker,Next action,Next check
KIT-02,Kitchen,Open,Maintenance lead,,Recheck cabinet base,2026-11-27
BTH-01,Hall bath,Blocked,Property manager,Vanity top on backorder,Confirm delivery and reschedule,2026-11-28
Use Open when someone can take the next step. Use Blocked when a part, approval, access window or other dependency must come first. For blocked work, name the person who can clear the dependency. When closing a line, record what was verified and attach the matching after photo where available.
Review the packet before releasing the unit
- Reconcile the report and CSV by line ID. Check that the work order, unit and invoice reference match.
- Confirm each completed line shows the right room and condition. Flag missing photos and retain the original move-out record.
- Review every open or blocked line with the property manager. Call out items that affect the planned move-in and give each one a decision owner and next check date.
- File the dated inspection and matching make-ready PDF and CSV. When a vendor closes a line, keep the line ID and issue a new dated copy.
Open the rental turnover photo report template for the free, no-login Sample PDF + CSV ZIP. Then use the job photo report workbench to give each vendor item a line ID and take that same ID through the handoff.