Electrical Inspection Photo Report

Build a completion photo PDF for electrical panel upgrades, rewiring and grounding. Pair rough-in and finished work by circuit, then send a traceable record with the invoice.

Free sample ZIP with a US Letter PDF and Open-Items CSV. No login required.

20% off a One-Time Job Pass with LAUNCH20. Pay $7.20 for one job.

Sample work orderWO-2026-418

Maplewood Apt 3B

WO-01Vanity faucet replacement

Synthetic illustration of the vanity and faucet
Before
Synthetic illustration of the vanity and faucet
After
3 photo check findings3 completed ยท 1 open

Close out a panel upgrade after the walls are patched

You replace a basement panel and rewire two kitchen circuits. By the owner walkthrough, the new cable routes are behind drywall and the bonding connection is hard to see. Give the panel, each altered circuit and the grounding or bonding work their own photo pairs. Keep a panel directory correction on a separate line so the owner can find it without mistaking it for unfinished rewiring.

Electrical before-and-after photo checklist by panel and circuit

  1. Identify the panel before the swap. Pair an overview of the old and new enclosures from the same position and take separate label close-ups. Record the service address, panel designation, location and equipment rating from the nameplate.
  2. Capture the rewiring at rough-in. Use the same wall bay or room landmark to pair the original route with the new cable, boxes and protection plates while visible. Give a finished outlet or switch its own line and repeat the circuit ID so the two records stay connected.
  3. Document grounding and bonding by connection point. Pair the existing condition with the completed work at each accessible point in scope, such as the grounding electrode conductor connection or the bonding jumper. Use photos taken by the qualified electrician during the work and give concealed connections their own location notes.
  4. Pair the old panel directory with the final directory and use a separate pair for the covered panel and surrounding access area. Reference the electrician's test record for any device checks performed and identify the tested circuit or outlet in the notes.
  5. Compare each finished item with the agreed scope. Photograph a corrected circuit label at the same angle as the original. Keep any pending directory update, access issue or final inspection on its own Open or Blocked line with an owner and next date.

Give the owner a panel record and the office a return list

Put the service address, work order and permit number, if issued, on the PDF. Send it with the invoice and the final panel directory, and attach the electrician's test sheet and signed inspection record when available. For example, flag panel P1, line E-07 as awaiting a directory correction and assign the return visit in the Open-Items CSV. Record the latest inspection status using the official inspection result.

Frequently asked questions

What should a panel upgrade photo report show?

Include the old and new panel location, readable nameplates, the finished cover and the updated circuit directory. If there is more than one panel, use the same designation on every relevant photo line and on the directory.

How do I show rewiring that is already behind drywall?

Pair dated rough-in photos with the matching room and circuit reference. If the crew missed a pre-cover photo, state what was visible at the final visit and reference any available rough-in inspection record. The finished outlet photo documents the visible endpoint.

Which grounding photos are useful to the next electrician?

Provide a location view and a detail of each accessible connection in scope. Identify the connection point and the associated panel or service. Use the electrician's existing project photos where equipment has already been closed.

Can I send the PDF while the final inspection is pending?

Yes. Mark the installed work with its own status and show the final inspection as pending with the scheduled date if known. Add the inspector's signed result to the handoff when issued. The photo PDF is a record of the work shown.

Choose how to put your report together

CloseoutPack
CloseoutPack pairs photos by work-order line, checks for missing or reversed images, and exports a matching PDF and CSV. Pay per job or subscribe.
Word, Google Docs or Canva
Flexible page layout. Place and label the photos yourself, then update the punch list separately when something changes.
Monthly field-service software
A recurring subscription can make sense when your crew also needs shared dispatch, scheduling, and field records.