WO-2026-418Maplewood Apt 3B
WO-01Vanity faucet replacement
Create a roof repair photo PDF with damage, underlayment, flashing and ridge cap evidence. Give owners and adjusters a record tied to each roof slope.
Free sample ZIP with a US Letter PDF and Open-Items CSV. No login required.
20% off a One-Time Job Pass with LAUNCH20. Pay $7.20 for one job.
WO-2026-418WO-01Vanity faucet replacement
A homeowner finds a ceiling stain below a chimney after a storm. Your crew documents lifted shingles on the west slope, opens the chimney perimeter and photographs the existing flashing before disturbing it. The finished roof will hide most of that work. Give the stain, the observed roof damage and the repaired chimney junction distinct lines so the owner and insurance adjuster can locate each image and see which work was authorized.
Put the property address, inspection or repair date and estimate reference on the report. Use the carrier claim number if one has been supplied. Send the PDF as an index to what was observed, exposed and repaired. For an estimate supplement, use a separate line for each newly exposed condition and attach the related estimate and original images if requested.
Start with the property, visit date and claim reference. Label the slope and landmark on each damage and repair line, and state who observed the condition. Keep the original photos available in case the adjuster asks for a file or an additional angle.
Give them separate lines with the same roof location. Photograph the existing and new underlayment before cover, then pair the original and replacement flashing at the wall, chimney or boot. Add the finished roof overview on its own line.
List the interior stain and the visible roof conditions separately. State what was observed, which areas were accessible and what inspection or testing is still due. Leave that investigation open with a next step.
Use separate dated lines for temporary protection and permanent repair. Preserve the pre-tarp damage photos and pair the repair photos at the same location. Note when the tarp was removed and leave any unapproved scope open.