Plumbing Job Completion Photo Report

Make a before-and-after PDF for plumbing leaks, shutoff valve replacements and water heater swaps. Show the repair, the recheck and the invoice scope.

Free sample ZIP with a US Letter PDF and Open-Items CSV. No login required.

20% off a One-Time Job Pass with LAUNCH20. Pay $7.20 for one job.

Sample work orderWO-2026-418

Maplewood Apt 3B

WO-01Vanity faucet replacement

Synthetic illustration of the vanity and faucet
Before
Synthetic illustration of the vanity and faucet
After
3 photo check findings3 completed ยท 1 open

Document the dry check before the cabinet is restocked

Water is pooling under a kitchen sink. A closer look shows a leaking angle stop and a swollen cabinet base. You replace the valve and supply connector, then return the fixture to service. Take a dry-check photo while the cabinet is still empty and put the swollen base on its own line. If the manager later asks whether cabinet damage was part of the plumbing invoice, the report shows the original condition, the repair and who owns the follow-up.

Plumbing repair before-and-after photo checklist

  1. Locate the leak before cleanup. Show the fixture or mechanical room in context, then capture the active drip, corrosion or water mark. Note whether you observed water at a supply connection, trap or another location.
  2. Pair the original and replacement shutoff valve. Show the angle stop, connector or main valve from the same side, and label the fixture or service zone so the next technician can identify it. Give a separate line to any neighboring fitting left in place.
  3. Record the under-sink dry check after restoring service. Frame the new connection, trap and cabinet base. Note the time, whether you ran water and what you observed at the fittings. Photograph any remaining moisture or pre-existing cabinet damage on a separate line.
  4. Photograph a water heater swap wide and close. Pair the old and new data plates and take another pair showing the installed connections, drain pan and temperature-and-pressure relief discharge route where visible. Use separate lines for details a wide image cannot show.
  5. If the job includes a pressure test, take a clear pressure gauge photo and state the test point, units and whether the reading was static or taken under flow. Record when and how long you observed it, and put any pending test or inaccessible section on an open line.

Tie the leak repair to what the customer authorized

Send the PDF with the invoice so the owner or property manager can see which valve, fixture or heater was serviced and what was checked afterward. Keep drying, cabinet repair or wall closure on separate lines with the responsible party and next visit. The Open-Items CSV carries those line IDs into the follow-up list.

Frequently asked questions

What photos help when a customer reports that a sink is leaking again?

Include the original leak point, the new connection and an under-sink dry-check image with the conditions and time of your recheck. On the callback, document the newly observed leak on its own line so you can compare the two locations.

What goes next to a pressure gauge photo?

Record the reading and units, the connection point, whether water was flowing and the observation time. If the job has a separate test sheet, reference it by work-order number so readers can find the full test record.

What should a landlord get after a water heater replacement?

Send the old and new data plate photos, the installed-unit overview and the close-ups of connections and visible discharge routing. Add the startup observations and attach any separate warranty or inspection paperwork that belongs with the work order.

How do I record water damage outside the plumbing scope?

Photograph the surrounding damage before work and describe the condition in the notes. Keep the completed leak repair on its own invoice line. If drying or restoration is pending, give it a separate status, contact and next action.

Choose how to put your report together

CloseoutPack
CloseoutPack pairs photos by work-order line, checks for missing or reversed images, and exports a matching PDF and CSV. Pay per job or subscribe.
Word, Google Docs or Canva
Flexible page layout. Place and label the photos yourself, then update the punch list separately when something changes.
Monthly field-service software
A recurring subscription can make sense when your crew also needs shared dispatch, scheduling, and field records.