WO-2026-418Maplewood Apt 3B
WO-01Vanity faucet replacement
Build an insurance claim photo PDF for water mitigation. Pair initial damage and final dry-out photos by room, and reference the drying log and estimate alongside the moisture meter readings.
Free sample ZIP with a US Letter PDF and Open-Items CSV. No login required.
20% off a One-Time Job Pass with LAUNCH20. Pay $7.20 for one job.
WO-2026-418WO-01Vanity faucet replacement
A dishwasher supply leak wets the kitchen toe kick and the adjoining hall. The mitigation crew documents the condition on arrival, photographs the opened cabinet base and tracks the wet subfloor at the same marked points over several visits. Keep the verified source, material removal, equipment and readings on separate lines. The adjuster can tie the emergency work to the estimate while cabinet replacement remains a separate decision.
Use the loss address, mitigation dates, work order and claim number if assigned on the PDF. Send it with the moisture map, daily drying log, equipment dates and itemized estimate. Use the same line IDs in the Open-Items CSV for the blocked cabinet cavity or pending rebuild approval. Retain original dated images so the adjuster can request the full-resolution files for any line.
Include the room overview, clear views of affected materials and the observed source or water path where visible. Label the room, date and material on each photo line and retain the original files for review.
A relative reading and a percent moisture reading have different meanings. Record the displayed scale and mode, plus the material and exact measurement point. Use the daily log for intermediate readings so the reviewer can follow the drying trend.
Include the drying log with the PDF. The photo pairs show where the readings were taken and how the area looked at the first and last visits. The log carries the full time series, equipment changes and any readings you did not photograph.
Keep removal and drying on their own mitigation lines. Open a separate reconstruction line with the cabinet location, authorization status and person who can release the next phase. The adjuster can review the mitigation invoice while the rebuild stays visible in the follow-up list.